Al-Arbya (Fire Tank) EXEDRA PROJECT VALUE 2.1 Million PROJECT SCOPE construction of Factory included Fire tank with volume 1.5 ton with Value 2.1 Million in SIDC PROJECT DURATION 2 months PROJECT STATUS Completed